JACOBY HARRIS-TUMLINSON Well Details
Texas Wells · Limestone County · FARRAR (COTTON VALLEY LIME) field · XTO ENERGY INC.
API No.
Latest Permit
Spud Date
Latest Completion
JACOBY HARRIS-TUMLINSON (API 29332411) is operated by XTO ENERGY INC. and sits in the FARRAR (COTTON VALLEY LIME) oil & gas field of Limestone County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (2,198,617 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2020-10-31
→ 2020-11-01 |
XTO Energy/ExxonMobil | 1,449 | 12,172 | 2,198,617 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2021-03-02 | Administrative re-save | XTO ENERGY INC. | FARRAR (COTTON VALLEY LIME) | Producing / Horizontal |
| 2021-01-15 |
New permit 2021-01-15 Completion 2020-12-08 Type → Producing |
XTO ENERGY INC. | FARRAR (COTTON VALLEY LIME) | Producing / Horizontal |
| 2020-03-10 | Administrative re-save | XTO ENERGY INC. | FARRAR (COTTON VALLEY LIME) | Shut-In Producer / Horizontal |
| 2019-12-04 |
Initial filing Permit: 2019-12-04 Spud: 2019-08-05 Completion: 2019-11-19 |
XTO ENERGY INC. | FARRAR (COTTON VALLEY LIME) | Shut-In Producer / Horizontal |