PLOMERO H I BREWER B ULW Well Details
Texas Wells · Live Oak County · EAGLEVILLE (EAGLE FORD-2) field · BURLINGTON RESOURCES O & G CO LP
API No.
Latest Permit
Spud Date
Latest Completion
PLOMERO H I BREWER B ULW (API 29736089) is operated by BURLINGTON RESOURCES O & G CO LP and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of Live Oak County, Texas.
Surface location: 28.0000, -98.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (21,162,414 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2021-01-24
→ 2021-02-05 |
ConocoPhillips Company/Burlington Resources | 8,537 | 11,937 | 21,162,414 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-03-22 | Administrative re-save | BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2024-03-14 |
New permit 2024-03-14 Completion 2021-08-14 |
BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2021-08-11 | Administrative re-save | BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2021-06-18 |
New permit 2021-06-18 Completion 2021-03-26 Type → Producing |
BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2021-01-05 | Administrative re-save | BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |
| 2020-12-16 |
Initial filing Permit: 2020-12-16 Spud: 2020-06-24 Completion: 2020-07-19 |
BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |