SID M. KYLE 26 Well Details
Texas Wells · Loving County · PHANTOM (WOLFCAMP) field · LRR PECOS VALLEY, LLC
API No.
Latest Permit
Spud Date
Latest Completion
SID M. KYLE 26 (API 30132132) is operated by LRR PECOS VALLEY, LLC and sits in the PHANTOM (WOLFCAMP) oil & gas field of Loving County, Texas.
Surface location: 31.0000, -103.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (6,399,960 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2014-06-02
→ 2014-06-10 |
Tema Oil and Gas Company | 4,728 | 11,840 | 6,399,960 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-08-30 | Administrative re-save | LRR PECOS VALLEY, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2022-05-30 |
New permit 2022-05-30 Operator → LRR PECOS VALLEY, LLC |
LRR PECOS VALLEY, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2018-07-31 | Administrative re-save | ROSEHILL OPERATING COMPANY, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2018-07-30 |
New permit 2018-07-30 Operator → ROSEHILL OPERATING COMPANY, LLC Field → PHANTOM (WOLFCAMP) |
ROSEHILL OPERATING COMPANY, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2016-06-23 | Field → GRICE (WOLFCAMP) | TEMA OIL AND GAS COMPANY | GRICE (WOLFCAMP) | Producing / Horizontal |
| 2014-09-11 |
Initial filing Permit: 2014-09-11 Spud: 2014-03-19 Completion: 2014-06-27 |
TEMA OIL AND GAS COMPANY | PHANTOM (WOLFCAMP) | Producing / Horizontal |