ARNO 78-TTT-B33 WF Well Details
Texas Wells · Loving County · PHANTOM (WOLFCAMP) field · MATADOR PRODUCTION COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
ARNO 78-TTT-B33 WF (API 30132686) is operated by MATADOR PRODUCTION COMPANY and sits in the PHANTOM (WOLFCAMP) oil & gas field of Loving County, Texas.
Surface location: 31.6679, -103.6073
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (6,961,794 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2019-01-23 | Matador Production Company | 5,293 | 10,645 | 6,961,794 | — |
Update History (8 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-04-20 |
New permit 2020-02-18 Completion 2018-05-04 |
MATADOR PRODUCTION COMPANY | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2020-03-04 |
New permit 2019-11-21 Completion 2017-11-29 |
MATADOR PRODUCTION COMPANY | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2020-02-18 |
New permit 2020-02-18 Completion 2018-05-04 |
MATADOR PRODUCTION COMPANY | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2019-11-21 |
New permit 2019-11-21 Completion 2017-05-03 |
MATADOR PRODUCTION COMPANY | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2018-02-15 |
New permit 2017-11-30 Completion 2017-11-29 |
MATADOR PRODUCTION COMPANY | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2017-12-21 |
New permit 2017-09-08 Completion 2017-05-03 |
MATADOR PRODUCTION COMPANY | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2017-11-30 |
New permit 2017-11-30 Completion 2017-11-29 |
MATADOR PRODUCTION COMPANY | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2017-09-08 |
Initial filing Permit: 2017-09-08 Spud: 2016-12-23 Completion: 2017-05-03 |
MATADOR PRODUCTION COMPANY | PHANTOM (WOLFCAMP) | Producing / Horizontal |