STATE PACIFIC 55-T2-8X17 Well Details
Texas Wells · Loving County · PHANTOM (WOLFCAMP) field · BHP BILLITON PET(TXLA OP) CO
API No.
Latest Permit
Spud Date
Latest Completion
STATE PACIFIC 55-T2-8X17 (API 30132753) is operated by BHP BILLITON PET(TXLA OP) CO and sits in the PHANTOM (WOLFCAMP) oil & gas field of Loving County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (8,644,542 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2016-01-31
→ 2016-02-05 |
BHP Billiton Petroleum | 7,759 | 10,894 | 8,644,542 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-07-13 | Administrative re-save | BHP BILLITON PET(TXLA OP) CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2017-05-08 |
New permit 2017-05-08 |
BHP BILLITON PET(TXLA OP) CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2016-09-07 | Administrative re-save | BHP BILLITON PET(TXLA OP) CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2016-08-29 |
Initial filing Permit: 2016-08-29 Spud: 2015-12-24 Completion: 2016-02-23 |
BHP BILLITON PET(TXLA OP) CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |