BIG HORN 56-1-29 Well Details
Texas Wells · Loving County · PHANTOM (WOLFCAMP) field · WPX ENERGY PERMIAN, LLC
API No.
Latest Permit
Spud Date
Latest Completion
BIG HORN 56-1-29 (API 30133437) is operated by WPX ENERGY PERMIAN, LLC and sits in the PHANTOM (WOLFCAMP) oil & gas field of Loving County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (7,647,655 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-06-28
→ 2023-07-01 |
WPX Energy | 4,562 | 11,811 | 7,647,655 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-02-05 | Administrative re-save | WPX ENERGY PERMIAN, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2023-11-15 |
New permit 2023-11-15 Completion 2023-07-15 Type → Producing Operator → WPX ENERGY PERMIAN, LLC |
WPX ENERGY PERMIAN, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2018-05-18 | Administrative re-save | ANADARKO E&P ONSHORE LLC | PHANTOM (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2018-03-12 |
Initial filing Permit: 2018-03-12 Spud: 2017-10-08 Completion: 2017-10-22 |
ANADARKO E&P ONSHORE LLC | PHANTOM (WOLFCAMP) | Shut-In Producer / Horizontal |