JUDGE 3 Well Details
Texas Wells · Loving County · PHANTOM (WOLFCAMP) field · HEADINGTON ENERGY PARTNERS, LLC
API No.
Latest Permit
Spud Date
Latest Completion
JUDGE 3 (API 30134112) is operated by HEADINGTON ENERGY PARTNERS, LLC and sits in the PHANTOM (WOLFCAMP) oil & gas field of Loving County, Texas.
Surface location: 31.0000, -103.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (13,384,916 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2019-01-27
→ 2019-02-03 |
Headington Energy Partners, LLC | 5,184 | 11,637 | 13,384,916 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-11-13 | Administrative re-save | HEADINGTON ENERGY PARTNERS, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2019-08-26 |
New permit 2019-08-26 Completion 2019-03-31 Type → Producing |
HEADINGTON ENERGY PARTNERS, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2018-11-20 |
Initial filing Permit: 2018-10-08 Spud: 2018-09-02 Completion: 2018-09-25 |
HEADINGTON ENERGY PARTNERS, LLC | PHANTOM (WOLFCAMP) | Shut-In Producer / Horizontal |