QUEEN ROBYN W2E2 K Well Details
Texas Wells · Loving County · PHANTOM (WOLFCAMP) field · TAP ROCK OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
QUEEN ROBYN W2E2 K (API 30136166) is operated by TAP ROCK OPERATING, LLC and sits in the PHANTOM (WOLFCAMP) oil & gas field of Loving County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (28,826,315 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-05-11
→ 2023-06-06 |
Civitas Permian Operating, LLC | 10,343 | 13,160 | 28,826,315 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-01-11 | Administrative re-save | TAP ROCK OPERATING, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2023-11-17 |
Initial filing Permit: 2023-11-17 Spud: 2022-12-10 Completion: 2023-10-30 |
TAP ROCK OPERATING, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |