ELIAS 16-9 UNIT 2 Well Details
Texas Wells · Martin County · SPRABERRY (TREND AREA) field · ENDEAVOR ENERGY RESOURCES L.P.
API No.
Latest Permit
Spud Date
Latest Completion
ELIAS 16-9 UNIT 2 (API 31745648) is operated by ENDEAVOR ENERGY RESOURCES L.P. and sits in the SPRABERRY (TREND AREA) oil & gas field of Martin County, Texas.
Surface location: 32.3897, -101.7026
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (18,303,810 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2024-07-11
→ 2024-07-31 |
Endeavor Energy Resources | 10,189 | 8,132 | 18,303,810 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-08-15 | Administrative re-save | ENDEAVOR ENERGY RESOURCES L.P. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2025-01-06 |
New permit 2025-01-06 Completion 2024-09-18 Type → Producing |
ENDEAVOR ENERGY RESOURCES L.P. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2024-06-20 | Administrative re-save | ENDEAVOR ENERGY RESOURCES L.P. | SPRABERRY (TREND AREA) | Shut-In Producer / Horizontal |
| 2024-04-11 |
New permit 2024-04-11 |
ENDEAVOR ENERGY RESOURCES L.P. | SPRABERRY (TREND AREA) | Shut-In Producer / Horizontal |
| 2024-02-29 | Administrative re-save | ENDEAVOR ENERGY RESOURCES L.P. | SPRABERRY (TREND AREA) | Shut-In Producer / Horizontal |
| 2023-12-18 |
Initial filing Permit: 2023-12-18 Spud: 2023-10-17 Completion: 2023-11-02 |
ENDEAVOR ENERGY RESOURCES L.P. | SPRABERRY (TREND AREA) | Shut-In Producer / Horizontal |