JOHN BRAUN A UNIT 1 Well Details
Texas Wells · Midland County · SPRABERRY (TREND AREA) field · XTO ENERGY INC.
API No.
Latest Permit
Spud Date
Latest Completion
JOHN BRAUN A UNIT 1 (API 32939635) is operated by XTO ENERGY INC. and sits in the SPRABERRY (TREND AREA) oil & gas field of Midland County, Texas.
Surface location: 31.0000, -102.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (14,481,821 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-10-11
→ 2015-10-12 |
XTO Energy/ExxonMobil | 8,280 | 9,860 | 14,481,821 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-02-07 | Administrative re-save | XTO ENERGY INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2017-01-27 |
New permit 2017-01-27 Completion 2015-10-29 Field → SPRABERRY (TREND AREA) |
XTO ENERGY INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2016-02-25 |
New permit 2016-01-26 Completion 2016-01-12 |
XTO ENERGY INC. | SPRABERRY (TREND AREA) R 40 EXC | Producing / Horizontal |
| 2016-02-02 |
New permit 2015-11-24 Completion 2015-10-29 |
XTO ENERGY INC. | SPRABERRY (TREND AREA) R 40 EXC | Producing / Horizontal |
| 2016-01-26 |
New permit 2016-01-26 Completion 2016-01-12 |
XTO ENERGY INC. | SPRABERRY (TREND AREA) R 40 EXC | Producing / Horizontal |
| 2015-11-24 |
Initial filing Permit: 2015-11-24 Spud: 2015-05-06 Completion: 2015-10-29 |
XTO ENERGY INC. | SPRABERRY (TREND AREA) R 40 EXC | Producing / Horizontal |