MARALO 41-32 ALLOCATION 3204 Well Details
Texas Wells · Midland County · SPRABERRY (TREND AREA) field · XTO ENERGY INC.
API No.
Latest Permit
Spud Date
Latest Completion
MARALO 41-32 ALLOCATION 3204 (API 32940223) is operated by XTO ENERGY INC. and sits in the SPRABERRY (TREND AREA) oil & gas field of Midland County, Texas.
Surface location: 31.0000, -101.0000
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (14,582,134 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2016-01-30
→ 2016-02-04 |
XTO Energy/ExxonMobil | 10,798 | 9,532 | 13,066,494 | — |
| 2015-12-01 | XTO Energy/ExxonMobil | 10,798 | 9,518 | 1,515,640 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2016-09-01 | Administrative re-save | XTO ENERGY INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2016-08-03 |
New permit 2016-08-03 Completion 2016-06-21 |
XTO ENERGY INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2016-06-27 | Administrative re-save | XTO ENERGY INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2016-05-09 |
Initial filing Permit: 2016-05-09 Spud: 2015-07-24 Completion: 2016-02-01 |
XTO ENERGY INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |