RIO SAN GABRIEL 28-29 UNIT 2 Well Details
Texas Wells · Midland County · SPRABERRY (TREND AREA) field · ENDEAVOR ENERGY RESOURCES L.P.
API No.
Latest Permit
Spud Date
Latest Completion
RIO SAN GABRIEL 28-29 UNIT 2 (API 32942504) is operated by ENDEAVOR ENERGY RESOURCES L.P. and sits in the SPRABERRY (TREND AREA) oil & gas field of Midland County, Texas.
Surface location: 31.8046, -102.0832
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (23,602,908 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2019-01-20
→ 2019-02-09 |
Endeavor Energy Resources | 11,002 | 9,504 | 23,602,908 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-11-07 | Administrative re-save | ENDEAVOR ENERGY RESOURCES L.P. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2019-08-22 |
New permit 2019-08-22 |
ENDEAVOR ENERGY RESOURCES L.P. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2019-08-14 | Administrative re-save | ENDEAVOR ENERGY RESOURCES L.P. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2019-05-03 |
Initial filing Permit: 2019-05-03 Spud: 2018-08-22 Completion: 2019-03-12 |
ENDEAVOR ENERGY RESOURCES L.P. | SPRABERRY (TREND AREA) | Producing / Horizontal |