WALKER SU B - A Well Details
Texas Wells · Nacogdoches County · CARTHAGE (HAYNESVILLE SHALE) field · EXCO OPERATING COMPANY, LP
API No.
Latest Permit
Spud Date
Latest Completion
WALKER SU B - A (API 34733438) is operated by EXCO OPERATING COMPANY, LP and sits in the CARTHAGE (HAYNESVILLE SHALE) oil & gas field of Nacogdoches County, Texas.
Surface location: 31.4425, -94.3657
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (37,669,435 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2022-08-11
→ 2022-08-30 |
EXCO Resources, Inc. | 9,831 | 14,574 | 37,669,435 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-01-12 | Administrative re-save | EXCO OPERATING COMPANY, LP | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2022-10-24 |
New permit 2022-10-24 Completion 2022-09-08 Type → Producing |
EXCO OPERATING COMPANY, LP | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2022-07-19 | Administrative re-save | EXCO OPERATING COMPANY, LP | CARTHAGE (HAYNESVILLE SHALE) | Shut-In Producer / Horizontal |
| 2022-06-16 |
Initial filing Permit: 2022-06-16 Spud: 2022-03-17 Completion: 2022-06-11 |
EXCO OPERATING COMPANY, LP | CARTHAGE (HAYNESVILLE SHALE) | Shut-In Producer / Horizontal |