BLACK STONE MINERALS COMPANY Well Details
Texas Wells · Newton County · CLAY POINT, SOUTH (WILCOX) field · TRI-C RESOURCES, LLC
API No.
Latest Permit
Spud Date
Latest Completion
BLACK STONE MINERALS COMPANY (API 35130911) is operated by TRI-C RESOURCES, LLC and sits in the CLAY POINT, SOUTH (WILCOX) oil & gas field of Newton County, Texas.
Surface location: 30.0000, -93.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (104,076 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2016-07-22 | Tri-C Resources, LLC | — | 10,439 | 104,076 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-01-07 | Administrative re-save | TRI-C RESOURCES, LLC | CLAY POINT, SOUTH (WILCOX) | Producing / Directional |
| 2018-07-16 |
New permit 2018-07-16 Spudded 2018-07-03 Completion 2018-07-03 |
TRI-C RESOURCES, LLC | CLAY POINT, SOUTH (WILCOX) | Producing / Directional |
| 2016-09-23 | Administrative re-save | TRI-C RESOURCES, LLC | CLAY POINT, SOUTH (WILCOX) | Producing / Directional |
| 2016-08-24 |
New permit 2016-08-24 Completion 2016-07-22 Type → Producing |
TRI-C RESOURCES, LLC | CLAY POINT, SOUTH (WILCOX) | Producing / Directional |
| 2016-02-12 | Administrative re-save | TRI-C RESOURCES, LLC | CLAY POINT, SOUTH (WILCOX) | Shut-In Producer / Directional |
| 2016-01-22 |
Initial filing Permit: 2016-01-22 Spud: 2015-10-28 Completion: 2015-12-16 |
TRI-C RESOURCES, LLC | CLAY POINT, SOUTH (WILCOX) | Shut-In Producer / Directional |