HARRISON 131 Well Details
Texas Wells · Ochiltree County · ALLEN-PARKER (MARMATON) field · CHAPARRAL ENERGY, L.L.C.
API No.
Latest Permit
Spud Date
Latest Completion
HARRISON 131 (API 35733428) is operated by CHAPARRAL ENERGY, L.L.C. and sits in the ALLEN-PARKER (MARMATON) oil & gas field of Ochiltree County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (2,234,379 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2014-08-19
→ 2014-08-20 |
Chaparral Energy, LLC | 4,905 | 7,040 | 2,234,379 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2015-01-21 | Administrative re-save | CHAPARRAL ENERGY, L.L.C. | ALLEN-PARKER (MARMATON) | Producing / Horizontal |
| 2014-10-17 |
Initial filing Permit: 2014-10-17 Spud: 2014-07-19 Completion: 2014-08-21 |
CHAPARRAL ENERGY, L.L.C. | ALLEN-PARKER (MARMATON) | Producing / Horizontal |