HULL OIL UNIT B Well Details
Texas Wells · Panola County · CARTHAGE (TRAVIS PEAK) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
HULL OIL UNIT B (API 36533034) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the CARTHAGE (TRAVIS PEAK) oil & gas field of Panola County, Texas.
Surface location: 32.1946, -94.2963
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (7,686 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2014-09-25 | Devon Energy Production Company L. P. | — | 9,800 | 7,686 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2015-03-09 |
New permit 2014-11-13 Completion 2014-09-26 Field → CARTHAGE (TRAVIS PEAK) |
DEVON ENERGY PRODUCTION CO, L.P. | CARTHAGE (TRAVIS PEAK) | Producing / Vertical |
| 2014-11-20 |
New permit 2014-03-31 Completion 2014-01-03 Field → CARTHAGE (TRAVIS PEAK 6400) |
DEVON ENERGY PRODUCTION CO, L.P. | CARTHAGE (TRAVIS PEAK 6400) | Producing / Vertical |
| 2014-11-13 |
Initial filing Permit: 2014-11-13 Spud: 1994-10-12 Completion: 2014-09-26 |
DEVON ENERGY PRODUCTION CO, L.P. | CARTHAGE (TRAVIS PEAK) | Producing / Vertical |