JESTER GAS UNIT Well Details
Texas Wells · Panola County · CARTHAGE (HAYNESVILLE SHALE) field · SABINE OIL & GAS CORPORATION
API No.
Latest Permit
Spud Date
Latest Completion
JESTER GAS UNIT (API 36538432) is operated by SABINE OIL & GAS CORPORATION and sits in the CARTHAGE (HAYNESVILLE SHALE) oil & gas field of Panola County, Texas.
Surface location: 32.2177, -94.0637
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (34,632,612 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-12-20
→ 2019-01-20 |
Sabine Oil & Gas Corporation | 11,470 | 11,128 | 34,632,612 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-12-07 |
Completion 2020-06-03 |
SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2023-11-10 |
New permit 2023-11-10 Completion 2019-02-06 |
SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2020-07-06 | Administrative re-save | SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2020-06-08 |
New permit 2020-06-08 Completion 2020-06-03 |
SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2019-04-04 | Administrative re-save | SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2019-03-12 |
Initial filing Permit: 2019-03-12 Spud: 2018-09-24 Completion: 2019-02-06 |
SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |