SHARP LEWIS - ALLOC Well Details
Texas Wells · Panola County · CARTHAGE (HAYNESVILLE SHALE) field · SILVER HILL ENERGY OPERATING LLC
API No.
Latest Permit
Spud Date
Latest Completion
SHARP LEWIS - ALLOC (API 36538717) is operated by SILVER HILL ENERGY OPERATING LLC and sits in the CARTHAGE (HAYNESVILLE SHALE) oil & gas field of Panola County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (28,749,774 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2022-06-26
→ 2022-07-11 |
Silver Hill Operating, LLC | 8,546 | 10,857 | 28,749,774 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-01-17 | Administrative re-save | SILVER HILL ENERGY OPERATING LLC | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2022-12-13 |
New permit 2022-12-13 |
SILVER HILL ENERGY OPERATING LLC | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2022-12-02 | Administrative re-save | SILVER HILL ENERGY OPERATING LLC | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2022-10-20 |
New permit 2022-10-20 Completion 2022-08-05 Operator → SILVER HILL ENERGY OPERATING LLC |
SILVER HILL ENERGY OPERATING LLC | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2022-06-22 | Administrative re-save | PINE WAVE ENERGY PARTNERS OP,LLC | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2022-04-22 |
Initial filing Permit: 2022-04-22 Spud: 2022-02-12 Completion: 2022-03-07 |
PINE WAVE ENERGY PARTNERS OP,LLC | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |