STATE NEAL LETHCO E 20-19 Well Details
Texas Wells · Pecos County · HOEFS T-K (WOLFCAMP) field · DIAMONDBACK E&P LLC
API No.
Latest Permit
Spud Date
Latest Completion
STATE NEAL LETHCO E 20-19 (API 37140177) is operated by DIAMONDBACK E&P LLC and sits in the HOEFS T-K (WOLFCAMP) oil & gas field of Pecos County, Texas.
Surface location: 31.0000, -102.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (32,408,418 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2020-08-15
→ 2020-09-02 |
Diamondback E&P LLC | 10,203 | 12,068 | 32,408,418 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-12-17 | Administrative re-save | DIAMONDBACK E&P LLC | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2020-11-23 |
Initial filing Permit: 2020-11-23 Spud: 2019-12-08 Completion: 2020-09-12 |
DIAMONDBACK E&P LLC | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |