MOORE SHARK 10-9 UNIT Well Details
Texas Wells · Pecos County · HOEFS T-K (WOLFCAMP) field · DIAMONDBACK E&P LLC
API No.
Latest Permit
Spud Date
Latest Completion
MOORE SHARK 10-9 UNIT (API 37140248) is operated by DIAMONDBACK E&P LLC and sits in the HOEFS T-K (WOLFCAMP) oil & gas field of Pecos County, Texas.
Surface location: 31.0000, -103.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (26,142,942 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2021-09-23
→ 2021-10-04 |
Diamondback E&P LLC | 10,959 | 10,608 | 26,142,942 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-02-16 |
Spudded 2020-07-02 |
DIAMONDBACK E&P LLC | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2022-01-25 |
New permit 2022-01-25 Spudded 2021-07-05 Completion 2021-10-16 Type → Producing |
DIAMONDBACK E&P LLC | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2020-12-18 | Administrative re-save | DIAMONDBACK E&P LLC | HOEFS T-K (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2020-12-01 |
Initial filing Permit: 2020-12-01 Spud: 2020-07-05 Completion: 2020-09-17 |
DIAMONDBACK E&P LLC | HOEFS T-K (WOLFCAMP) | Shut-In Producer / Horizontal |