ARCO-IRT Well Details
Texas Wells · Pecos County · PECOS VALLEY (WOLFCAMP) field · OLSEN ENERGY INC.
API No.
Latest Permit
Spud Date
Latest Completion
ARCO-IRT (API 37140307) is operated by OLSEN ENERGY INC. and sits in the PECOS VALLEY (WOLFCAMP) oil & gas field of Pecos County, Texas.
Surface location: 31.2273, -102.8217
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-05-17 | Administrative re-save | OLSEN ENERGY INC. | PECOS VALLEY (WOLFCAMP) | Producing / Vertical |
| 2024-03-13 |
New permit 2024-03-13 Spudded 2024-02-05 Completion 2024-03-01 Type → Producing Operator → OLSEN ENERGY INC. Field → PECOS VALLEY (WOLFCAMP) |
OLSEN ENERGY INC. | PECOS VALLEY (WOLFCAMP) | Producing / Vertical |
| 2023-04-06 | Administrative re-save | PECOS RIVER EXPLORATION, LLC | PECOS VALLEY (ELLENBURGER) | Shut-In Producer / Vertical |
| 2023-03-21 |
Initial filing Permit: 2023-03-21 Spud: 2021-05-31 Completion: 2021-06-21 |
PECOS RIVER EXPLORATION, LLC | PECOS VALLEY (ELLENBURGER) | Shut-In Producer / Vertical |