MISTER ED 48-18-7 WA2 Well Details
Texas Wells · Pecos County · HOEFS T-K (WOLFCAMP) field · XTO ENERGY INC.
API No.
Latest Permit
Spud Date
Latest Completion
MISTER ED 48-18-7 WA2 (API 37140339) is operated by XTO ENERGY INC. and sits in the HOEFS T-K (WOLFCAMP) oil & gas field of Pecos County, Texas.
Surface location: 31.1452, -103.1632
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (30,643,998 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2022-04-19
→ 2022-05-16 |
XTO Energy/ExxonMobil | 11,049 | 10,359 | 30,643,998 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-02-24 | Administrative re-save | XTO ENERGY INC. | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2025-01-23 |
New permit 2025-01-23 |
XTO ENERGY INC. | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2023-01-25 | Administrative re-save | XTO ENERGY INC. | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2023-01-20 |
New permit 2023-01-20 Completion 2022-06-11 |
XTO ENERGY INC. | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2022-09-15 | Administrative re-save | XTO ENERGY INC. | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2022-07-15 |
Initial filing Permit: 2022-07-15 Spud: 2021-11-06 Completion: 2022-06-25 |
XTO ENERGY INC. | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |