TAYLOR-B- Well Details
Texas Wells · Reagan County · SPRABERRY (TREND AREA) field · LAREDO PETROLEUM - DALLAS, INC.
API No.
Latest Permit
Spud Date
Latest Completion
TAYLOR-B- (API 38338180) is operated by LAREDO PETROLEUM - DALLAS, INC. and sits in the SPRABERRY (TREND AREA) oil & gas field of Reagan County, Texas.
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (1,881,516 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2013-07-12 | Laredo Petroleum, Inc. | — | 10,443 | 296,352 | — |
|
2013-03-27
→ 2013-03-28 |
Laredo Petroleum, Inc. | — | 10,443 | 1,585,164 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2013-11-22 |
New permit 2013-09-12 Completion 2013-08-29 |
LAREDO PETROLEUM - DALLAS, INC. | SPRABERRY (TREND AREA) | Producing / Vertical |
| 2013-08-29 |
Initial filing Permit: 2013-04-23 Completion: 2013-03-31 |
LAREDO PETROLEUM - DALLAS, INC. | SPRABERRY (TREND AREA) | Producing / Vertical |