WEATHERBY Well Details
Texas Wells · Reagan County · LIN (WOLFCAMP) field · CALLON PETROLEUM OPERATING CO
API No.
Latest Permit
Spud Date
Latest Completion
WEATHERBY (API 38338211) is operated by CALLON PETROLEUM OPERATING CO and sits in the LIN (WOLFCAMP) oil & gas field of Reagan County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (5,847,225 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2013-05-29
→ 2013-06-05 |
Callon Petroleum Operating Company | 5,323 | 8,029 | 5,847,225 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2014-06-16 |
New permit 2014-03-03 Completion 2013-08-26 |
CALLON PETROLEUM OPERATING CO | LIN (WOLFCAMP) | Producing / Horizontal |
| 2014-02-26 |
New permit 2014-01-14 Spudded 2013-02-21 Completion 2013-11-30 |
CALLON PETROLEUM OPERATING CO | LIN (WOLFCAMP) | Producing / Horizontal |
| 2014-02-25 |
Initial filing Permit: 2013-09-11 Completion: 2013-08-26 |
CALLON PETROLEUM OPERATING CO | LIN (WOLFCAMP) | Producing / Horizontal |