UNIVERSITY CENTRAL Well Details
Texas Wells · Reagan County · LIN (WOLFCAMP) field · EP ENERGY E&P COMPANY, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
UNIVERSITY CENTRAL (API 38338886) is operated by EP ENERGY E&P COMPANY, L.P. and sits in the LIN (WOLFCAMP) oil & gas field of Reagan County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (14,871,318 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2016-12-29
→ 2017-01-20 |
EP Energy | 8,172 | 7,477 | 14,871,318 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-06-26 |
Spudded 2014-07-19 |
EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2017-05-08 |
New permit 2017-05-08 Spudded 2014-08-17 Type → Producing |
EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2015-04-09 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2015-02-24 |
Initial filing Permit: 2015-02-24 Spud: 2014-07-19 Completion: 2014-08-27 |
EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Shut-In Producer / Horizontal |