TURNER AR UNIT C Well Details
Texas Wells · Reagan County · LIN (WOLFCAMP) field · CALLON PETROLEUM OPERATING CO
API No.
Latest Permit
Spud Date
Latest Completion
TURNER AR UNIT C (API 38339488) is operated by CALLON PETROLEUM OPERATING CO and sits in the LIN (WOLFCAMP) oil & gas field of Reagan County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (12,664,764 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-11-26
→ 2015-12-08 |
American Energy Permian Basin | 7,796 | 8,856 | 12,664,764 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-02-14 | Administrative re-save | CALLON PETROLEUM OPERATING CO | LIN (WOLFCAMP) | Producing / Horizontal |
| 2016-11-16 |
New permit 2016-11-16 Operator → CALLON PETROLEUM OPERATING CO |
CALLON PETROLEUM OPERATING CO | LIN (WOLFCAMP) | Producing / Horizontal |
| 2016-04-13 |
Initial filing Permit: 2016-03-17 Spud: 2015-09-19 Completion: 2015-12-21 |
AMERICAN ENERGY-PERM BASIN, LLC | LIN (WOLFCAMP) | Producing / Horizontal |