EAGLEHEAD C A2 Well Details
Texas Wells · Reagan County · LIN (WOLFCAMP) field · CALLON PETROLEUM OPERATING CO
API No.
Latest Permit
Spud Date
Latest Completion
EAGLEHEAD C A2 (API 38339890) is operated by CALLON PETROLEUM OPERATING CO and sits in the LIN (WOLFCAMP) oil & gas field of Reagan County, Texas.
Surface location: 31.0000, -101.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (17,993,430 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-11-16
→ 2017-12-14 |
Callon Petroleum Operating Company | 7,842 | 8,827 | 17,993,430 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2018-07-10 | Administrative re-save | CALLON PETROLEUM OPERATING CO | LIN (WOLFCAMP) | Producing / Horizontal |
| 2018-06-05 |
New permit 2018-06-05 Spudded 2017-08-29 Type → Producing |
CALLON PETROLEUM OPERATING CO | LIN (WOLFCAMP) | Producing / Horizontal |
| 2018-05-04 | Administrative re-save | CALLON PETROLEUM OPERATING CO | LIN (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2018-04-03 |
Initial filing Permit: 2018-04-03 Spud: 2017-08-09 Completion: 2018-01-17 |
CALLON PETROLEUM OPERATING CO | LIN (WOLFCAMP) | Shut-In Producer / Horizontal |