UNIVERSITY CENTRAL Well Details
Texas Wells · Reagan County · LIN (WOLFCAMP) field · RRP OPERATING LLC
API No.
Latest Permit
Spud Date
Latest Completion
UNIVERSITY CENTRAL (API 38339966) is operated by RRP OPERATING LLC and sits in the LIN (WOLFCAMP) oil & gas field of Reagan County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (27,555,528 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-08-14
→ 2018-09-08 |
EP Energy | 8,578 | 8,282 | 27,555,528 | — |
Update History (5 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-04-14 |
New permit 2026-04-14 Spudded 2017-08-11 Completion 2017-09-18 Type → Shut-In Producer Operator → RRP OPERATING LLC |
RRP OPERATING LLC | LIN (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2019-02-06 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2018-12-05 |
New permit 2018-12-05 Spudded 2017-08-30 Completion 2018-09-12 |
EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2018-03-27 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2018-02-27 |
Initial filing Permit: 2018-02-27 Spud: 2017-08-28 Completion: 2017-09-18 |
EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |