CATHEDRAL STATE 57-6 UNIT Well Details
Texas Wells · Reeves County · PHANTOM (WOLFCAMP) field · CIMAREX ENERGY CO.
API No.
Latest Permit
Spud Date
Latest Completion
CATHEDRAL STATE 57-6 UNIT (API 38934876) is operated by CIMAREX ENERGY CO. and sits in the PHANTOM (WOLFCAMP) oil & gas field of Reeves County, Texas.
Surface location: 31.0000, -104.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (6,862,693 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-09-28
→ 2015-10-01 |
Cimarex Energy Co. | 4,756 | 9,698 | 6,862,693 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2018-08-14 | Administrative re-save | CIMAREX ENERGY CO. | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2018-06-18 |
New permit 2018-06-18 |
CIMAREX ENERGY CO. | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2018-02-05 | Administrative re-save | CIMAREX ENERGY CO. | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2017-09-14 |
New permit 2017-09-14 |
CIMAREX ENERGY CO. | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2015-10-28 | Administrative re-save | CIMAREX ENERGY CO. | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2015-10-21 |
Initial filing Permit: 2015-10-21 Spud: 2015-06-26 Completion: 2015-10-06 |
CIMAREX ENERGY CO. | PHANTOM (WOLFCAMP) | Producing / Horizontal |