JR 56-T3-26 Well Details
Texas Wells · Reeves County · PHANTOM (WOLFCAMP) field · BHP BILLITON PET(TXLA OP) CO
API No.
Latest Permit
Spud Date
Latest Completion
JR 56-T3-26 (API 38934954) is operated by BHP BILLITON PET(TXLA OP) CO and sits in the PHANTOM (WOLFCAMP) oil & gas field of Reeves County, Texas.
Surface location: 31.6933, -103.8712
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (11,092,210 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-10-05
→ 2015-10-09 |
BHP Billiton Petroleum | 4,987 | 10,473 | 5,546,105 | — |
|
2015-10-05
→ 2015-10-09 |
BHP Billiton Petroleum | 4,987 | 10,473 | 5,546,105 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2016-02-22 |
New permit 2015-11-20 |
BHP BILLITON PET(TXLA OP) CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2016-02-15 |
New permit 2016-02-15 |
BHP BILLITON PET(TXLA OP) CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2015-11-20 |
Initial filing Permit: 2015-11-20 Spud: 2015-08-22 Completion: 2015-11-01 |
BHP BILLITON PET(TXLA OP) CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |