STATE CRIMM 0-65X67 Well Details
Texas Wells · Reeves County · FORD, WEST (WOLFCAMP) field · BPX OPERATING COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
STATE CRIMM 0-65X67 (API 38935032) is operated by BPX OPERATING COMPANY and sits in the FORD, WEST (WOLFCAMP) oil & gas field of Reeves County, Texas.
Surface location: 31.7661, -104.0405
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (14,109,584 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-11-24
→ 2015-11-30 |
BHP Billiton Petroleum | 8,787 | 9,677 | 14,109,584 | — |
Update History (8 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-10-05 | Administrative re-save | BPX OPERATING COMPANY | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2020-09-30 |
New permit 2020-09-30 Completion 2020-04-07 |
BPX OPERATING COMPANY | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2020-04-27 | Administrative re-save | BPX OPERATING COMPANY | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2020-04-24 |
New permit 2020-04-24 Completion 2019-11-18 Operator → BPX OPERATING COMPANY |
BPX OPERATING COMPANY | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2017-10-25 |
New permit 2017-04-20 |
BHP BILLITON PET(TXLA OP) CO | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2017-04-26 |
New permit 2017-02-08 |
BHP BILLITON PET(TXLA OP) CO | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2017-04-20 |
New permit 2017-04-20 Field → FORD, WEST (WOLFCAMP) |
BHP BILLITON PET(TXLA OP) CO | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2017-02-08 |
Initial filing Permit: 2017-02-08 Spud: 2015-10-18 Completion: 2015-12-22 |
BHP BILLITON PET(TXLA OP) CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |