CONGER UNIT 185-184 B Well Details
Texas Wells · Reeves County · HOEFS T-K (WOLFCAMP) field · TALL CITY OPERATIONS III LLC
API No.
Latest Permit
Spud Date
Latest Completion
CONGER UNIT 185-184 B (API 38938268) is operated by TALL CITY OPERATIONS III LLC and sits in the HOEFS T-K (WOLFCAMP) oil & gas field of Reeves County, Texas.
Surface location: 31.1567, -103.5821
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (25,450,893 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2019-07-30
→ 2019-08-15 |
Tall City Operations III LLC | 8,246 | 10,560 | 25,450,893 | — |
Update History (8 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-01-19 | Administrative re-save | TALL CITY OPERATIONS III LLC | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2023-11-01 |
New permit 2023-11-01 Completion 2023-06-22 |
TALL CITY OPERATIONS III LLC | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2020-07-09 |
New permit 2020-05-19 Field → HOEFS T-K (WOLFCAMP) |
TALL CITY OPERATIONS III LLC | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2020-06-11 |
New permit 2020-03-09 Field → PHANTOM (WOLFCAMP) |
TALL CITY OPERATIONS III LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2020-05-19 |
New permit 2020-05-19 Field → HOEFS T-K (WOLFCAMP) |
TALL CITY OPERATIONS III LLC | HOEFS T-K (WOLFCAMP) | Producing / Horizontal |
| 2020-03-09 |
New permit 2020-03-09 Completion 2020-02-07 |
TALL CITY OPERATIONS III LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2020-01-09 | Administrative re-save | TALL CITY OPERATIONS III LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2019-10-08 |
Initial filing Permit: 2019-10-08 Spud: 2019-05-03 Completion: 2019-08-17 |
TALL CITY OPERATIONS III LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |