CURACAO 18 UNIT Well Details
Texas Wells · Reeves County · PHANTOM (WOLFCAMP) field · COLGATE OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
CURACAO 18 UNIT (API 38938672) is operated by COLGATE OPERATING, LLC and sits in the PHANTOM (WOLFCAMP) oil & gas field of Reeves County, Texas.
Surface location: 31.3927, -103.2988
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (18,653,578 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2020-06-22
→ 2020-08-01 |
Colgate Operating, LLC | 10,019 | 11,064 | 18,653,578 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2021-06-14 | Administrative re-save | COLGATE OPERATING, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2021-03-24 |
Initial filing Permit: 2021-03-24 Spud: 2019-11-25 Completion: 2020-08-20 |
COLGATE OPERATING, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |