TROOPER 158-181 UNIT E Well Details
Texas Wells · Reeves County · PHANTOM (WOLFCAMP) field · TALL CITY OPERATIONS III LLC
API No.
Latest Permit
Spud Date
Latest Completion
TROOPER 158-181 UNIT E (API 38940160) is operated by TALL CITY OPERATIONS III LLC and sits in the PHANTOM (WOLFCAMP) oil & gas field of Reeves County, Texas.
Surface location: 31.0982, -103.5864
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (19,390,266 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-06-17
→ 2023-07-04 |
Tall City Operations III LLC | 7,903 | 10,460 | 19,390,266 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-01-05 | Administrative re-save | TALL CITY OPERATIONS III LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2023-10-25 |
New permit 2023-10-25 |
TALL CITY OPERATIONS III LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2023-10-24 | Administrative re-save | TALL CITY OPERATIONS III LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2023-09-07 |
Initial filing Permit: 2023-09-07 Spud: 2022-10-07 Completion: 2023-07-22 |
TALL CITY OPERATIONS III LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |