DELTA EAST UNIT Well Details
Texas Wells · Scurry County · GARDEN CITY, S. (WOLFCAMP) field · VERADO ENERGY, INC.
API No.
Latest Permit
Spud Date
Latest Completion
DELTA EAST UNIT (API 41535437) is operated by VERADO ENERGY, INC. and sits in the GARDEN CITY, S. (WOLFCAMP) oil & gas field of Scurry County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (5,616,896 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-11-12
→ 2018-11-16 |
Verado Energy, Inc. | 5,424 | 6,970 | 5,616,896 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-09-05 | Administrative re-save | VERADO ENERGY, INC. | GARDEN CITY, S. (WOLFCAMP) | Producing / Horizontal |
| 2019-05-14 |
Initial filing Permit: 2019-05-14 Spud: 2018-09-09 Completion: 2018-12-08 |
VERADO ENERGY, INC. | GARDEN CITY, S. (WOLFCAMP) | Producing / Horizontal |