PARKER Well Details
Texas Wells · Scurry County · GARDEN CITY, S. (WOLFCAMP) field · WESTERN CHIEF OPERATING, L.L.C.
API No.
Latest Permit
Spud Date
Latest Completion
PARKER (API 41535438) is operated by WESTERN CHIEF OPERATING, L.L.C. and sits in the GARDEN CITY, S. (WOLFCAMP) oil & gas field of Scurry County, Texas.
Surface location: 32.7147, -100.7113
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (51,547 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2019-01-15 | Western Chief Operating, LLC | — | 7,456 | 51,547 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-07-22 |
Spudded 2018-11-21 |
WESTERN CHIEF OPERATING, L.L.C. | GARDEN CITY, S. (WOLFCAMP) | Producing / Vertical |
| 2019-05-21 |
Initial filing Permit: 2019-05-21 Spud: 2018-11-25 Completion: 2018-12-03 |
WESTERN CHIEF OPERATING, L.L.C. | GARDEN CITY, S. (WOLFCAMP) | Producing / Vertical |