ELLIS SWD Well Details
Texas Wells · Shelby County · JOAQUIN (JETER) field · BROOKSTON ENERGY, INC.
API No.
Latest Permit
Spud Date
Latest Completion
ELLIS SWD (API 41931267) is operated by BROOKSTON ENERGY, INC. and sits in the JOAQUIN (JETER) oil & gas field of Shelby County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (132,869 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2013-02-26 | XTO Energy/ExxonMobil | — | 7,545 | 132,869 | — |
Update History (5 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-10-14 |
Completion 2024-09-16 |
BROOKSTON ENERGY, INC. | JOAQUIN (JETER) | Active UIC / Vertical |
| 2024-09-24 |
New permit 2024-09-24 Type → Active UIC Field → JOAQUIN (JETER) |
BROOKSTON ENERGY, INC. | JOAQUIN (JETER) | Active UIC / Vertical |
| 2020-03-26 | Administrative re-save | BROOKSTON ENERGY, INC. | JOAQUIN (TRAVIS PEAK) | Shut-In UIC / Vertical |
| 2020-03-12 |
New permit 2020-03-12 Spudded 2008-05-02 Completion 2020-03-09 Type → Shut-In UIC Operator → BROOKSTON ENERGY, INC. |
BROOKSTON ENERGY, INC. | JOAQUIN (TRAVIS PEAK) | Shut-In UIC / Vertical |
| 2013-08-28 |
Initial filing Permit: 2013-08-19 Completion: 2013-05-22 |
XTO ENERGY INC. | JOAQUIN (TRAVIS PEAK) | Producing / Vertical |