KICKAPOO CREEK GAS UNIT Well Details
Texas Wells · Smith County · OVERTON (TRAVIS PEAK) field · FAULCONER ENERGY, LLC
API No.
Latest Permit
Spud Date
Latest Completion
KICKAPOO CREEK GAS UNIT (API 42331648) is operated by FAULCONER ENERGY, LLC and sits in the OVERTON (TRAVIS PEAK) oil & gas field of Smith County, Texas.
Surface location: 32.1838, -95.0919
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (310,162 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2026-05-12 | Faulconer Energy | — | 8,115 | 163,889 | — |
| 2022-03-25 | Faulconer Energy | — | 11,770 | 146,273 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-08-26 | Administrative re-save | FAULCONER ENERGY, LLC | OVERTON (TRAVIS PEAK) | Producing / Vertical |
| 2022-07-05 |
New permit 2022-07-05 Completion 2022-03-29 |
FAULCONER ENERGY, LLC | OVERTON (TRAVIS PEAK) | Producing / Vertical |
| 2022-06-22 | Administrative re-save | FAULCONER ENERGY, LLC | OVERTON (TRAVIS PEAK) | Producing / Vertical |
| 2022-05-31 |
Initial filing Permit: 2022-05-31 Spud: 1984-04-05 Completion: 2022-04-01 |
FAULCONER ENERGY, LLC | OVERTON (TRAVIS PEAK) | Producing / Vertical |