KICKAPOO CREEK GAS UNIT Well Details
Texas Wells · Smith County · OVERTON (TRAVIS PEAK) field · FAULCONER ENERGY, LLC
Latest Permit
Spud Date
Latest Completion
KICKAPOO CREEK GAS UNIT (API 42331648) is operated by FAULCONER ENERGY, LLC and sits in the OVERTON (TRAVIS PEAK) oil & gas field of Smith County, Texas.
Surface location: 32.1838, -95.0919
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (310,162 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2026-05-12 | Faulconer Energy | — | 8,115 | 163,889 | — |
| 2022-03-25 | Faulconer Energy | — | 11,770 | 146,273 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-08-26 | Administrative re-save | FAULCONER ENERGY, LLC | OVERTON (TRAVIS PEAK) | Producing / Vertical |
| 2022-07-05 |
New permit 2022-07-05 Completion 2022-03-29 |
FAULCONER ENERGY, LLC | OVERTON (TRAVIS PEAK) | Producing / Vertical |
| 2022-06-22 | Administrative re-save | FAULCONER ENERGY, LLC | OVERTON (TRAVIS PEAK) | Producing / Vertical |
| 2022-05-31 |
Initial filing Permit: 2022-05-31 Spud: 1984-04-05 Completion: 2022-04-01 |
FAULCONER ENERGY, LLC | OVERTON (TRAVIS PEAK) | Producing / Vertical |