ADAIR WOLFCAMP UNIT Well Details
Texas Wells · Terry County · ADAIR (WOLFCAMP) field · HILCORP ENERGY COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
ADAIR WOLFCAMP UNIT (API 44500049) is operated by HILCORP ENERGY COMPANY and sits in the ADAIR (WOLFCAMP) oil & gas field of Terry County, Texas.
Update History (5 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-12-22 | Administrative re-save | HILCORP ENERGY COMPANY | ADAIR (WOLFCAMP) | Shut-In UIC / Unknown |
| 2025-12-08 |
New permit 2025-12-08 Spudded 1951-04-23 Completion 2025-11-18 Type → Shut-In UIC Operator → HILCORP ENERGY COMPANY |
HILCORP ENERGY COMPANY | ADAIR (WOLFCAMP) | Shut-In UIC / Unknown |
| 2023-05-25 |
Completion 2020-04-06 |
APACHE CORPORATION | ADAIR (WOLFCAMP) | Active UIC / Unknown |
| 2022-11-28 |
New permit 2022-11-28 Spudded 1948-11-15 Completion 2022-03-21 Orientation → Unknown |
APACHE CORPORATION | ADAIR (WOLFCAMP) | Active UIC / Unknown |
| 2011-08-10 |
Initial filing Permit: 2011-05-12 Completion: 2011-04-01 |
APACHE CORPORATION | ADAIR (WOLFCAMP) | Active UIC / Vertical |