GRACEY, H. C. Well Details
Texas Wells · Terry County · KINGDOM (ABO REEF) field · BOAZ ENERGY II OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
GRACEY, H. C. (API 44532360) is operated by BOAZ ENERGY II OPERATING, LLC and sits in the KINGDOM (ABO REEF) oil & gas field of Terry County, Texas.
Surface location: 33.3387, -102.5484
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (101,047 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2017-04-17 | Boaz Energy II Operating, LLC | — | 8,213 | 101,047 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-07-28 | Administrative re-save | BOAZ ENERGY II OPERATING, LLC | KINGDOM (ABO REEF) | Producing / Vertical |
| 2017-07-14 |
New permit 2017-07-14 Spudded 2013-02-15 Completion 2017-04-20 Operator → BOAZ ENERGY II OPERATING, LLC |
BOAZ ENERGY II OPERATING, LLC | KINGDOM (ABO REEF) | Producing / Vertical |
| 2013-09-19 |
Initial filing Permit: 2013-04-03 Completion: 2013-03-11 |
STANOLIND OPERATING LLC | KINGDOM (ABO REEF) | Producing / Vertical |