POPE Well Details
Texas Wells · Tyler County · BELINDA (YEGUA 5100) field · FORT APACHE ENERGY, INC.
API No.
Latest Permit
Spud Date
Latest Completion
POPE (API 45730814) is operated by FORT APACHE ENERGY, INC. and sits in the BELINDA (YEGUA 5100) oil & gas field of Tyler County, Texas.
Surface location: 30.6512, -94.3063
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2015-12-16 | Field → BELINDA (YEGUA 5100) | FORT APACHE ENERGY, INC. | BELINDA (YEGUA 5100) | Producing / Vertical |
| 2014-10-05 |
Initial filing Permit: 2014-10-05 Spud: 2012-09-16 Completion: 2012-11-25 |
FORT APACHE ENERGY, INC. | WILDCAT | Producing / Vertical |