RWT BUFFALO BAYOU 16-4 UNIT Well Details
Texas Wells · Upton County · SPRABERRY (TREND AREA) field · CHEVRON U. S. A. INC.
Latest Permit
Spud Date
Latest Completion
RWT BUFFALO BAYOU 16-4 UNIT (API 46143049) is operated by CHEVRON U. S. A. INC. and sits in the SPRABERRY (TREND AREA) oil & gas field of Upton County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (21,938,196 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2025-09-29
→ 2025-10-21 |
Chevron USA Inc. | 10,880 | 9,439 | 21,938,196 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-06-19 | Administrative re-save | CHEVRON U. S. A. INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2026-05-21 |
New permit 2026-05-21 Completion 2026-01-05 |
CHEVRON U. S. A. INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2025-12-08 | Administrative re-save | CHEVRON U. S. A. INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2025-11-04 |
Initial filing Permit: 2025-11-04 Spud: 2025-02-17 Completion: 2025-05-08 |
CHEVRON U. S. A. INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |