MONROE EAST STATE 1-4 WRD UNIT Well Details
Texas Wells · Ward County · PHANTOM (WOLFCAMP) field · SHELL WESTERN E&P
API No.
Latest Permit
Spud Date
Latest Completion
MONROE EAST STATE 1-4 WRD UNIT (API 47535920) is operated by SHELL WESTERN E&P and sits in the PHANTOM (WOLFCAMP) oil & gas field of Ward County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (0 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2012-02-23 | Chesapeake Operating, Inc. | 4,783 | — | — | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-12-11 | Administrative re-save | SHELL WESTERN E&P | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2019-09-23 |
New permit 2019-09-23 Spudded 2011-12-23 Operator → SHELL WESTERN E&P |
SHELL WESTERN E&P | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2013-01-09 |
Initial filing Permit: 2012-04-20 Completion: 2012-03-22 |
CHESAPEAKE OPERATING, INC. | PHANTOM (WOLFCAMP) | Producing / Horizontal |