CHUPACABRA 51 STATE UNIT Well Details
Texas Wells · Ward County · PHANTOM (WOLFCAMP) field · POINT ENERGY PARTNERS PETRO, LLC
API No.
Latest Permit
Spud Date
Latest Completion
CHUPACABRA 51 STATE UNIT (API 47536313) is operated by POINT ENERGY PARTNERS PETRO, LLC and sits in the PHANTOM (WOLFCAMP) oil & gas field of Ward County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (1,855,934 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2013-09-16
→ 2013-09-18 |
Cimarex Energy Co. | 5,482 | 11,577 | 1,855,934 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-05-30 |
New permit 2024-05-30 Operator → POINT ENERGY PARTNERS PETRO, LLC |
POINT ENERGY PARTNERS PETRO, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2014-07-18 |
Initial filing Permit: 2014-01-28 Spud: 2013-07-15 Completion: 2013-09-20 |
CIMAREX ENERGY CO. | PHANTOM (WOLFCAMP) | Producing / Horizontal |