WINCHESTER 34-142 Well Details
Texas Wells · Ward County · PHANTOM (WOLFCAMP) field · APACHE CORPORATION
API No.
Latest Permit
Spud Date
Latest Completion
WINCHESTER 34-142 (API 47536569) is operated by APACHE CORPORATION and sits in the PHANTOM (WOLFCAMP) oil & gas field of Ward County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (1,868,952 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2014-07-18
→ 2014-07-20 |
Cimarex Energy Co. | 4,653 | 10,973 | 1,868,952 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-09-30 |
Spudded 2014-04-27 |
APACHE CORPORATION | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2025-08-20 |
New permit 2025-08-20 |
APACHE CORPORATION | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2025-07-09 | Administrative re-save | APACHE CORPORATION | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2025-04-29 |
New permit 2025-04-29 Operator → APACHE CORPORATION |
APACHE CORPORATION | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2015-05-14 | Administrative re-save | CIMAREX ENERGY CO. | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2015-01-29 |
Initial filing Permit: 2015-01-29 Spud: 2014-04-17 Completion: 2014-08-06 |
CIMAREX ENERGY CO. | PHANTOM (WOLFCAMP) | Producing / Horizontal |