SARATOGA 34-161 Well Details
Texas Wells · Ward County · PHANTOM (WOLFCAMP) field · APACHE CORPORATION
API No.
Latest Permit
Spud Date
Latest Completion
SARATOGA 34-161 (API 47537140) is operated by APACHE CORPORATION and sits in the PHANTOM (WOLFCAMP) oil & gas field of Ward County, Texas.
Surface location: 31.0000, -103.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (18,052,272 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-03-07
→ 2017-03-20 |
Callon Petroleum Operating Company | 10,140 | 11,700 | 18,052,272 | — |
Update History (8 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-09-15 | Administrative re-save | APACHE CORPORATION | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2025-08-21 |
New permit 2025-08-21 Operator → APACHE CORPORATION |
APACHE CORPORATION | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2019-05-14 | Administrative re-save | CALLON PETROLEUM OPERATING CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2019-02-04 |
New permit 2019-02-04 |
CALLON PETROLEUM OPERATING CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2018-02-22 | Administrative re-save | CALLON PETROLEUM OPERATING CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2017-11-08 |
New permit 2017-11-08 Type → Producing Operator → CALLON PETROLEUM OPERATING CO |
CALLON PETROLEUM OPERATING CO | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2017-06-21 | Administrative re-save | AMEREDEV LLC | PHANTOM (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2017-04-26 |
Initial filing Permit: 2017-04-26 Spud: 2016-11-24 Completion: 2017-01-19 |
AMEREDEV LLC | PHANTOM (WOLFCAMP) | Shut-In Producer / Horizontal |