UNIVERSITY 18-3-14 WA4 Well Details
Texas Wells · Ward County · PHANTOM (WOLFCAMP) field · FORGE ENERGY OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
UNIVERSITY 18-3-14 WA4 (API 47537822) is operated by FORGE ENERGY OPERATING, LLC and sits in the PHANTOM (WOLFCAMP) oil & gas field of Ward County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (19,943,811 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2021-11-16
→ 2021-12-14 |
Forge Energy, LLC | 10,102 | 11,343 | 19,943,811 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-05-25 | Administrative re-save | FORGE ENERGY OPERATING, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2022-03-31 |
New permit 2022-03-31 Completion 2022-01-07 Type → Producing Operator → FORGE ENERGY OPERATING, LLC |
FORGE ENERGY OPERATING, LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2021-08-02 | Administrative re-save | XTO ENERGY INC. | PHANTOM (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2021-07-07 |
Initial filing Permit: 2021-07-07 Spud: 2019-08-19 Completion: 2019-10-08 |
XTO ENERGY INC. | PHANTOM (WOLFCAMP) | Shut-In Producer / Horizontal |