PUIG, L. F. III GAS UNIT 2 Well Details
Texas Wells · Webb County · OWEN (OLMOS) field · LAREDO ENERGY
API No.
Latest Permit
Spud Date
Latest Completion
PUIG, L. F. III GAS UNIT 2 (API 47942169) is operated by LAREDO ENERGY and sits in the OWEN (OLMOS) oil & gas field of Webb County, Texas.
Surface location: 27.4503, -99.3711
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (6,016,542 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2013-02-15 | Laredo Energy | 5,442 | 5,462 | 6,016,542 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2014-10-23 |
New permit 2014-09-03 Spudded 2012-12-08 Completion 2014-08-14 |
LAREDO ENERGY | OWEN (OLMOS) | Producing / Horizontal |
| 2013-09-06 |
New permit 2013-05-03 |
LAREDO ENERGY | OWEN (OLMOS) | Producing / Horizontal |
| 2013-09-04 |
Initial filing Permit: 2013-03-14 Completion: 2013-02-15 |
LAREDO ENERGY | OWEN (OLMOS) | Producing / Horizontal |