REUTHINGER Well Details
Texas Wells · Webb County · OWEN (OLMOS) field · LAREDO ENERGY OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
REUTHINGER (API 47943064) is operated by LAREDO ENERGY OPERATING, LLC and sits in the OWEN (OLMOS) oil & gas field of Webb County, Texas.
Surface location: 27.6687, -99.5409
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (7,026,480 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-11-29
→ 2015-12-04 |
Laredo Energy Operating, LLC | 6,826 | 8,780 | 7,026,480 | — |
Update History (7 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-11-03 | Administrative re-save | LAREDO ENERGY OPERATING, LLC | OWEN (OLMOS) | Producing / Horizontal |
| 2017-10-13 |
New permit 2017-10-13 Completion 2017-10-11 |
LAREDO ENERGY OPERATING, LLC | OWEN (OLMOS) | Producing / Horizontal |
| 2016-08-23 | Administrative re-save | LAREDO ENERGY OPERATING, LLC | OWEN (OLMOS) | Producing / Horizontal |
| 2016-08-08 |
New permit 2016-08-08 Completion 2016-07-28 |
LAREDO ENERGY OPERATING, LLC | OWEN (OLMOS) | Producing / Horizontal |
| 2016-02-12 | Administrative re-save | LAREDO ENERGY OPERATING, LLC | OWEN (OLMOS) | Producing / Horizontal |
| 2016-01-26 |
New permit 2016-01-26 Completion 2015-12-13 Type → Producing |
LAREDO ENERGY OPERATING, LLC | OWEN (OLMOS) | Producing / Horizontal |
| 2015-08-20 |
Initial filing Permit: 2015-07-22 Spud: 2015-03-02 Completion: 2015-03-21 |
LAREDO ENERGY OPERATING, LLC | OWEN (OLMOS) | Shut-In Producer / Horizontal |